BudgetingFinancial Guide

Film Budget Top Sheet Explained: How to Read Every Line

Charles HirschhornBy Charles HirschhornSeptember 14, 20266 min read

Quick answer

A film budget top sheet is the one-page summary of the full budget. It lists each account category with a single total, grouped into above-the-line, production, post, and other costs, then adds contingency and any completion bond fee to reach the grand total. Every number on it should come from the detail pages, and the header should say which draft and date it reflects.

On this page
  1. A sample top sheet
  2. What the header has to say
  3. What each block is telling you
  4. Fringes are inside the category totals
  5. Contingency, bond, and fees at the bottom
  6. How investors read a top sheet in two minutes
  7. Mistakes that make a top sheet useless
  8. Getting a top sheet from your data

A sample top sheet

This is the top sheet for HARBOR LIGHTS, a fictional 25-day feature. The totals are illustrative, but the layout is a common feature layout, and the account numbers follow the pattern in our film chart of accounts post.

HARBOR LIGHTS            Budget draft 4       Dated 09/10/2026
25 shoot days (5-day weeks), 5 weeks prep     Savannah, GA
Based on shooting script dated 08/28/2026 and schedule v3
AcctCategoryTotal
1100Story and rights$60,000
1200Producers unit$110,000
1300Director$95,000
1400Cast$310,000
1500Above-the-line travel and living$24,000
Total above the line$599,000
2000Production staff$185,000
2100Extra talent$48,000
2200Art department$96,000
2300Set construction$60,000
2500Set operations (grip)$118,000
2600Special effects$22,000
2700Set dressing$70,000
2800Property$34,000
2900Wardrobe$68,000
3100Makeup and hair$42,000
3200Lighting$132,000
3300Camera$158,000
3400Production sound$44,000
3500Transportation$96,000
3600Locations$210,000
3800Media and lab$18,000
Total production$1,401,000
4500Editorial$120,000
4600Music$60,000
4700Post sound$70,000
4800Post lab and DI$55,000
4900Titles and VFX$45,000
Total post$350,000
6500Publicity$12,000
6700Insurance$52,000
6800General expense, legal, accounting$110,000
Total other$174,000
Total below the line$1,925,000
Total above and below the line$2,524,000
Contingency, 10% of above and below$252,400
Completion bond fee (example quote)$45,000
Grand total$2,821,400

Below the line is production plus post plus other: $1,401,000 + $350,000 + $174,000 = $1,925,000. Add above the line: $599,000 + $1,925,000 = $2,524,000. Contingency is $2,524,000 x 0.10 = $252,400, and the grand total is $2,524,000 + $252,400 + $45,000 = $2,821,400.

What the header has to say

The three lines above the table are the most skipped and the most important once a budget has been revised a few times. A top sheet without a draft number and date can't be matched to its detail, and a budget without the script date and schedule version can't be checked against the pages it was built from. When a financier's lawyer attaches "the budget" to a loan agreement, this header is how everyone knows which one.

Add the assumptions a reader needs to interpret the totals: shoot days, prep weeks, week length, main location, and union agreements. A 25-day budget and a 22-day budget can have nearly identical top sheets, and only the header tells you which you're looking at.

What each block is telling you

Above the line (1100 to 1500) holds the deals made before anyone else is hired: rights, producers, director, cast, and their travel. These numbers are mostly contract amounts, so they don't move much with the schedule. The exception is cast, where day players and overtime do scale with days. See above the line for what belongs in it.

Production (2000 to 3800) is the shoot itself: staff, departments, equipment, locations, and transport. These accounts scale with prep weeks and shoot days, which is why a schedule change shows up here first. Post (4500 to 4900) runs from editorial through final mix and DI. Other (6500 to 6800) is insurance, legal, accounting, publicity, and office costs that aren't tied to one department.

Some budgets draw "the line" differently and put post and other in their own sections rather than inside below the line. Either works, as long as the subtotals are labeled.

Fringes are inside the category totals

On most budgeting programs, the camera total on the top sheet already includes camera crew fringes. Here is how the $158,000 in 3300 breaks down on the detail page:

DetailAmount
Camera labor (DP, operator, ACs, DIT)$104,000
Fringes on camera labor at 18%$18,720
Camera package rental$30,000
Expendables and media$5,280
Account 3300 total$158,000

$104,000 x 0.18 = $18,720, and $104,000 + $18,720 + $30,000 + $5,280 = $158,000. The 18% is an example blended rate. Fringes explains what goes into it, and film budget fringes walks through the union pieces.

Some producers add a memo line under the grand total showing total fringes across all accounts, so a reader can see how much of the budget is payroll taxes and benefits. If you add one, label it "included above" so nobody adds it twice.

Contingency, bond, and fees at the bottom

The bottom block is where small wording changes move real money. Contingency here is 10% of above and below the line. If it were figured on below the line only, it would be $1,925,000 x 0.10 = $192,500, which is $59,900 less. Both methods are in use, so write the base on the line. Film budget contingency covers how to choose.

A completion bond fee, if the financing requires one, sits under contingency as its own line. The $45,000 here is an example figure standing in for a guarantor's quote. Guarantors such as Film Finances analyze the script, budget, and schedule together before they issue a guarantee, so the top sheet they see has to agree with the schedule and the detail. Completion bonds explained goes further.

Producer overhead fees, when a studio or financier allows them, also appear in this block. Keep them separate from contingency; one is a payment and the other is a reserve.

How investors read a top sheet in two minutes

People who fund films look at a handful of ratios before any single line:

CheckIn this exampleWhat it tells them
Above the line share$599,000 / $2,524,000 = 23.7%Whether talent costs fit the scale of the shoot
Post share$350,000 / $2,524,000 = 13.9%Whether post and deliverables are funded
Locations per shoot day$210,000 / 25 = $8,400Whether the location plan is realistic
Contingency presentYes, 10%Whether surprises are funded at all

None of these has a correct answer. They are prompts for questions. A $95,000 director line next to a $310,000 cast line tells a reader the director is probably not the biggest name on the project, and they'll ask what the cast deals are.

Mistakes that make a top sheet useless

The worst one is a top sheet total typed in by hand. Suppose someone "fixes" locations on the summary page from $210,000 to $180,000 after a location falls through, but never changes the detail. The top sheet now shows $2,494,000 above and below, contingency of $249,400, and a grand total of $2,788,400. The detail still adds to $2,524,000. The two documents disagree by $33,000, and the first cost report will expose it.

Other common problems:

  1. Category totals exclude fringes while the grand total includes them, so the page doesn't foot.
  2. Account numbers on the top sheet don't match the chart of accounts the accountant uses, so actuals can't be posted against the budget.
  3. The contingency line doesn't say what it's a percentage of.
  4. There's no draft number, so an old version gets emailed to an investor.

Getting a top sheet from your data

Storiara's budget module generates a top sheet with account, description, quantity, unit, rate, fringe, and total columns, and a summary bar for above the line, below the line, post, other, contingency, and grand total. The totals come from the line items, which you can sync from the story's cast, crew, equipment, assets, and locations, and you can export the whole budget to Excel or print it.

For a spreadsheet version, the budget top sheet template has the same blocks and formulas that pull from detail tabs. The top sheet glossary entry has a shorter example if you need a one-page reference, and the film budget estimator gives a starting range for each block.

Frequently asked questions

What is the difference between a top sheet and a full budget?

The top sheet is page one: one line per account category with a total. The full budget behind it has every detail line (each crew position, rental, and purchase with its units, rate, and fringes). The top sheet is generated from the detail, never typed separately.

Is contingency calculated before or after fringes?

After. Category totals on a standard top sheet already include fringes, so a contingency calculated on the above-and-below-the-line total includes them in its base. Write the base next to the contingency line so nobody has to guess.

Where does the completion bond go on a top sheet?

Below contingency and above the grand total, as its own line. The amount comes from the guarantor's quote for that picture.

What percentage of a film budget is above the line?

There's no fixed rule; it depends on cast and talent deals. In the example on this page it is 23.7%. A reader compares that ratio against the cast attached and the scale of the production to see whether the numbers make sense together.

Sources

Plan your production in Storiara

Upload a PDF, Word, or Final Draft script. Storiara breaks it down into scenes, cast, locations, props, and wardrobe, and keeps the stripboard, budget, and call sheets tied to that breakdown.

Start Planning for Free
Charles Hirschhorn

Charles Hirschhorn

Financial Lead, Storiara

Financial strategist with deep experience in media and technology. Ensures Storiara's financial health while supporting our mission to transform film production.