Planning coverage for a scene
Take scene 14, INT. DINER - DAY, 2 3/8 pages. Maya confronts Joe across a booth. A director's shot list for it might be:
| Setup | Shot | Lens | Notes |
|---|---|---|---|
| 14 | Master, wide from counter | 32mm | Full scene |
| 14A | Medium two-shot, booth profile | 50mm | Full scene |
| 14B | OTS Joe onto Maya | 75mm | Full scene |
| 14C | Close single Maya | 85mm | From "You told him" to end |
| 14D | Insert, Maya slides envelope | 100mm macro | MOS |
| 14E | OTS Maya onto Joe | 75mm | Turnaround, relight |
| 14F | Close single Joe | 85mm | From "You told him" to end |
That's seven setups. Setups 14 through 14D all face one direction, so the gaffer lights once. Then the company turns around for 14E and 14F, which means moving video village, relighting, and re-dressing the part of the diner that's now in frame.
Why the amount of coverage drives the schedule
Coverage is where page count and shoot time come apart. A 1/8-page scene of a character walking to a car might be one setup. A 2 3/8-page dialogue scene with seven setups can take half a day. When a 1st AD builds the schedule, they ask the director how each scene will be covered, because pages alone don't tell them. A fully covered dialogue scene can also be shot with two cameras, cross-shooting both singles at once, which saves a turnaround but makes lighting and sound harder.
Common mistakes
Covering everything the same way. Not every scene needs singles. Scenes that will play in one wide shot shouldn't eat an hour for close-ups nobody will cut to.
Not covering enough on the day. The director falls behind and drops the reverse to make the day, then the editor finds the scene can't be cut without a jump. That's how pickup days get added to the post schedule.
Mismatched action between setups. If Maya slides the envelope with her left hand in the master and right hand in her close single, the editor loses the cut. The script supervisor tracks this, which is why they watch every take of every setup.
Where coverage shows up later
Coverage decisions feed the shot list, the setup count on the production report, and the editor's bins. The master shot is usually the anchor everything else cuts back to.
