Start work finish

Spencer KaufmanBy Spencer KaufmanSeptember 14, 2026

Definition

SWF, short for start work finish, is the day out of days code for a performer who starts and finishes on the same day. It belongs to a code set that also includes SW (start work), W (work), and WF (work finish), which together mark the first, middle, and last days a person is employed.

The four codes and how they bracket a job

CodeMeaningWhere it appears
SWStart workFirst day of a multi-day run
WWorkEvery work day between SW and WF
WFWork finishLast day of the run
SWFStart work finishA one-day engagement

Everything between an SW and its WF is part of the engagement, so cells in that span that aren't W are usually H (hold), T (travel), or R (rehearsal). A blank cell between SW and WF on a day out of days is usually a mistake unless the actor has an approved drop and pickup.

Counting paid days from the codes

Take the actor playing Detective Ruiz on a fictional 20-day feature. His row reads SW on day 9, W on 10, H on 11 and 12, W on 13, and WF on 14. Count from SW to WF inclusive: days 9 through 14 is six days. Four of them are work days (9, 10, 13, 14) and two are holds. On a contract with consecutive employment he gets paid for all six.

Now suppose the AD can move day 13's scene onto day 10. His row becomes SW on 9 and WF on 10, which is two days. That is four fewer paid days from moving one strip, which is why ADs and line producers stare at SW and WF dates when they shuffle the stripboard.

A cameo who shoots one scene on day 16 gets a single SWF. If that scene later needs a second day, the SWF has to become SW and WF, and the actor's deal changes from one day to two (plus any holds in between).

Rules behind the codes

SAG-AFTRA's theatrical rules say performers are paid on a consecutive basis from the first day they are told to report, with listed exceptions such as a single allowed break for day performers given a firm pickup date more than 10 calendar days out (SAG-AFTRA consecutive employment answer). Low budget agreements have their own exceptions, so check the agreement your show signed.

Where the codes show up

Casting quotes the span between SW and WF in deal memos, often as a day rate or weekly rate with a guaranteed number of days. The production office also uses the SW date to trigger start paperwork. You can generate the codes automatically from a schedule with the DOOD generator, or fill them in by hand in the day out of days template.

Frequently asked questions

What does SWF mean in film?

It means start work finish: the actor's first and last day are the same day. You'll see it on the day out of days for day players, cameos, and anyone who shoots a single scene.

What is the difference between SW and SWF?

SW marks the first day of a run that continues on later days and ends on a WF. SWF is a complete engagement in one day, so there is no separate WF cell.

Why do the SW and WF dates matter for pay?

Under consecutive employment rules on many union contracts, a performer is paid from their start date through their finish date, including hold days in between. The SW and WF codes define that span.

Sources

Keep the paperwork in one place

Upload a PDF, Word, or Final Draft script and Storiara pulls out scenes, cast, locations, props, and wardrobe, then builds the schedule, budget, and call sheets from that breakdown.

Start Planning for Free
Spencer Kaufman

Spencer Kaufman

Revenue & Strategy Lead, Storiara

Revenue and strategy expert growing Storiara's market presence and building partnerships with filmmakers and studios worldwide.